Basic details
Guarantee: 3 years
Customization support: OEM and ODM
Place of origin: Xiamen, China
Model number: A3004
Application: In general
Medium temperature: Standard temperature
Power: hydraulic
Media: water
Oil port size: G1/2 inches
Structure: Control and shutdown
Product Name: Angle valve
Materials: Brass body
End: chromium
Use: Water control
Function: Angle
Equipment manufacturer: 500 pieces
Minimum order quantity: 500 pieces
Characteristics: Water level adjustment
Bathroom accessories: Toilet tank water inlet valve
Item NO. |
A3004 |
Product Name |
Angle Vlave |
Body Material |
Brass |
Surface Finish |
Chrome |
Working temperature |
0-80 degree |
Features |
Hot cold |
Salt Spray Test |
ASS-48 Hours/NSS-72 Hours |
OEM And ODM |
Acceptable |
Warranty |
3 years |
Sample ready time |
1-5days |
Delivery time |
20-30days |
Q1. Are you a manufacturer or a trading company?
We are a professional manufacturer with more than 12 years of production experience. Our factory is located in Xiamen City.
Q2. Can we get samples from you for inspection and testing?
We can provide the sample and the customer pays the sample fee and shipping fee, but we will refund the sample fee to the customer when they mass-produce the order.
Q3. How many years of warranty do you have on your faucet?
We provide a 3-5 year warranty for brass faucets and 1-2 year warranty for zinc faucets depending on the quality grade. If any defect is confirmed to be caused by us, replacement or repair parts will be sent in the next order.
Q4. What is the capacity of your factory?
Our factory has a complete production line, including gravity casting line, machining line, polishing line, electroplating line and
The assembly line. We can produce 80,000 units per month.
Q5. Can you make custom products?
Of course, we can provide you with a complete set of customized solutions as follows:
1. Laser print your logo on the product with your permission.
2. Customize the packaging according to your requirements.
3. Based on the existing parts, we can recommend new styles for you.
4. An engineering design drawing shall be completed within 20 working days for endogenous output samples.